Pages

Friday 3 February 2023

There was movement at the Station

 


Happy new year - after a very long absence from working on the layout things are again progressing. Baseboard construction is now completed from the Camden terminus to the fiddle yard, There are 6 modules in total:

Camden

Nepean River

Elderslie / Kirkham

Narellan

Currans Hill

Kenny Hill / fiddle yard

The walk around layout is tight even after reducing the original curve radii. The backdrop is predominantly wall mounted with about 60 % now installed.

The 2023 plan is to complete the backdrop and all tasks requiring module separation and get the mainline for want of a better term in place so I can run trains end to end - the missing link is still the trestle approach to the Nepean River crossing. Structures and detailing will then take place. I have a friend in the area who has a brilliant layout  based on NSW Central West fully operational and amazing DCC/ sound functional however still lots of scenic and detailing work. This meeting originally through Historic vehicles  has prompted a rekindling of getting things going again and we are now assisting or perhaps motivating each other. 

A few shots of around Kenny Hill in various stages of completion

A Campbelltown bound passenger departing Kenny Hill



Light engine working through Kenny Hill to Narellan


I was unhappy with the tree to the left both foliage and location. The foliage has been redone and the tree relocated further to the right 

4101 runs through Kenny Hill with a load of empty BCHs for Narellan coal loader - as mentioned in previous captions the lighter tree has been rebuilt and relocated also backdrop a work in progress