Sunday, 28 August 2016


There has been some progress with the rising curve into the yard and creating a supporting surface for the polystyrene  for the landscape. The goods shed will sit at the back left. In the foreground, paper mockups/templates assist in planning for the siding into the milk depot.

Below is another shot of the milk siding and the milk depot early in its construction phase, the end of the yard can be seen top right

No comments:

Post a Comment